Completed in 2016, this project on the Encampment River South of Riverside, Wyoming, was previously constructed by another contractor on several different occasions. The need for the repair to this lower section was to decrease land loss that the landowner was receiving on an annual basis. The NSE design/build team assessed the existing geometry of the river and adjusted it according, at the location of the lateral erosion. Toe Wood was also installed at this location along with many willow transplants to help with necessary bank stability and lack of aquatic habitat.